Cone Zone
- A crane will be installed in the alley behind WDEP starting April 28, 2025. A portion of the sidewalk in front of the facility on 18th Street will be closed from May 12, 2025 through September 2026.
- Due to pending repairs, the walkthrough beneath the bridge between the Visual Arts Complex (VAC) and the CU Art Museum will be closed indefinitely starting March 30, 2025. We appreciate your understanding as we work to ensure the safety of our
- Construction of the Colorado Highway 119 Safety, Mobility and Bikeway Improvements Project has started and will be ongoing through 2027. Once complete, the corridor will have improved bike and bus facilities, and safer and more efficient
- The city of СÀ¶ÊÓÆµ has implemented changes to the lanes on Colorado Avenue that may affect your daily commute. These improvements are part of a broader effort to create a safer and more efficient transportation system for our entire community, and
- Campus construction on Regent Drive near the Coors Events Center may cause delays to Buff Buses and other traffic from 7 a.m. to 5 p.m. Regent Drive will be reduced to one lane during these hours, and flaggers will be directing traffic. Please plan
- Construction has begun for the on campus Limelight Hotel СÀ¶ÊÓÆµ. The Limelight Conference Center and Hotel at the 1400 block of Broadway will fill the gap in large conference space in the City of СÀ¶ÊÓÆµ. With approximately 250 rooms and a 15,
- Work will begin at the southern end of the corridor between Colorado Avenue and СÀ¶ÊÓÆµ Creek Path this spring and continue through summer 2024. Travelers can expect single vehicle lane closures and the east side sidewalk of 30th Street to be closed
- Residence One will be the first new, modern housing building to open in the area, North СÀ¶ÊÓÆµ Creek (NBC). It will house 332 upper division students in on-campus apartment-style housing. It will provide neighborhood amenities such as a café, UPS
- In 2021 a structural assessment of the building was completed by a structural engineer. A/E team is currently developing a design to address the recommendations of the report. The scope of work being evaluated consists of: a full structural
- On May 31, 2024, at 5 p.m. the Leonard H. Gemmill Engineering, Math & Physics Library, located in the Mathematics Building, will close for renovations. Our timeline for reopening right now is summer 2025. These renovations are needed to restore